The load test was green and the launch still fell over. What did the test not model?
A launch is a transient, not a steady state: users arrive in the same minutes, against cold caches, mostly doing sign-up writes and retrying as it slows. A typical load test ramps gently, uses a closed workload, stubs third parties, runs a smaller fleet and measures in ways that hide stalls.